OUR SERVICES

3-Phase Equipment Testing

“3-phase equipment testing Melbourne businesses rely on for AS/NZS 3760:2022 compliance. Digital reports same day.”

What is 3-phase equipment testing?

3-phase electrical equipment operates on a 400V AC supply across three live conductors, making it the standard power source for heavy industrial motors, compressors, pumps, CNC machinery and commercial HVAC systems. Testing 3-phase equipment under AS/NZS 3760:2022 requires specialised equipment and technical knowledge to verify earth continuity, insulation resistance and correct phase rotation — ensuring your equipment operates safely and within compliance requirements.

What's included?

Every test and tag service by Orion Services Group includes:

  • Visual inspection of all 3-phase equipment
  • Earth continuity testing
  • Insulation resistance testing
  • AS/NZS 3760:2022 compliant tags applied
  • Digital compliance report emailed same day
  • Photo evidence per asset where applicable

Testing Intervals

  • Industrial environments — every 6 months
  • Commercial environments — every 12 months
  • Construction sites — every 3 months

Who needs 3-phase equipment testing?

3-phase equipment testing Melbourne-wide is a legal requirement for any business operating machinery or equipment connected to a 400V three-phase supply. This includes manufacturing facilities, industrial warehouses, commercial kitchens, construction sites, and any workplace running heavy-duty electrical equipment such as motors, compressors, lathes, welding machines, or HVAC systems.

Under AS/NZS 3760:2022, employers have a duty of care to ensure all electrical equipment in the workplace is safe for use. For 3-phase equipment, this means regular testing at intervals determined by the environment — every 6 months in industrial settings, every 12 months in commercial environments, and every 3 months on construction sites.

Failure to comply can result in WorkSafe Victoria enforcement action, invalidated insurance, and significant liability in the event of an electrical incident.

The testing process

Every 3-phase equipment test carried out by Orion Services Group follows a structured process to AS/NZS 3760:2022:

  • Visual inspection — checking for obvious damage, wear, or unsafe modifications to equipment, cables, plugs and connections.
  • Earth continuity testing — verifying the integrity of the earth conductor to ensure fault current has a safe path.
  • Insulation resistance testing — measuring resistance between live conductors and earth to detect insulation breakdown.
  • Phase rotation check — confirming the correct phase sequence to prevent motor damage or unsafe operation.

Each item that passes receives a compliant test tag showing the test date, retest date, and unique asset identifier. A full digital compliance report is emailed the same day, ready for your records or any workplace audit.

Why choose Orion Services Group for 3-phase equipment testing in Melbourne?

Orion Services Group provides professional 3-phase equipment testing Melbourne businesses can count on — with same-day digital reporting, flexible scheduling, and a straightforward process that causes minimal disruption to your operations.

Every job is carried out using calibrated test equipment, fully insured, and documented to meet WorkSafe Victoria and AS/NZS 3760:2022 requirements. Whether you need a one-off compliance test or a scheduled maintenance program, Orion Services Group can accommodate your site and timeframe.

Same-day and urgent bookings are available for businesses facing inspections, audits, or equipment failures. Contact Orion Services Group to arrange a quote or book a test at your Melbourne site.

Ready to get your 3-phase equipment tested?

Same-day service available. Serving inner Melbourne and surrounds. Call us on 0421 946 915 or get a free quote online.

© 2026 Orion Services Group Pty Ltd | ABN 82 696 933 589

About Privacy Policy Terms of Service
Scroll to Top